Redcliffe State School Overpass Bridge

Redcliffe State School Overpass Bridge

CLIENT: Transport & Main Roads QLD

SCOPE

Sun Engineering was awarded the contract to do the detailing, fabrication and construction of an over road pedestrian bridge at the Redcliffe State High school. This project included 150 tonne of steelwork including the bridge structure, walkways, handrails and guarding. The entire bridge was fabricated and brought to site from Sun Engineering’s Carole Park facility. The long overpass structure was erected on site in one piece after it was assembled and transported from the paint yard.

VALUE

$515,000.00

DATE COMPLETED

2007