Diamantina Power Station

Diamantina Power Station

COMMODITY: Power Generation
CLIENT: CTEC

Scope

Sun Engineering was engaged for Construction of a 240MW Power Plant incorporating 4 of Siemens Gas Turbines, 2 Siemens Steam Turbines, 4 heat recovery boilers and ancillary plant and piping. The project required precision fitting of the Turbines and specialist welding of the boiler components. There were also many heavy lifts which needed to be optimized to reduce heavy crane lifts.

Value

$50,000,000.00

Date Completed

2014