Abbot Point

Abbot Point

COMMODITY: Coal
CLIENT: North Qld Bulk Ports Corporation

 New Surge Bin SBo2
Scope

Sun Engineering  were contracted for the supply and installation of the 2000 ton coal load out surge bin, we pre-fabricated the bin sections in the largest transportable sizes off site and then we brought the components to site and assembled at ground level into the largest possible size as limited by crane capacity then completed in the air a number of large sections.

Value

$23,700,000.00

Date Completed

2010


Replace Dump Station DS1
Scope

Construction of a new Coal Rail Dump Station including out loading conveyors, we were required to remove the existing mechanical and electrical equipment, conveyors and dump hoppers and manufacture new conveyors, dump hoppers and reinstall new mechanical equipment so as to upgrade the capacity of the coal terminal.

Value

$32,000,000.00

Date Completed

2010


X25 Upgrade
Scope

This includes the detailing, fabrication, installation and commissioning of the structural, mechanical, piping and electrical systems associated with the modifications to transfer towers, infeed conveyors, bund conveyor line 3, out loading conveyors and modification to existing transfer towers.

Value

$18,000,000.00

Date Completed

2009