Barrick Ltd – Porgera Mine Tank Repairs

Project Case Study

Project Type

Location

Porgera Mine, PNG

About The Project

Sun Engineering were contracted to demolish and construct a Concentrate Slurry Surge tank, Cyanide Destructions tank, 3 Carbon tanks and a Concentrator Tails tank in accordance with API 650 at the Porgera mine site. Sun Engineering completed the detailed drafting, procurement, rolled, cut, fabricated, primed, and delivered the steel plates to the site, Site constructed, tested and protective coated the tanks. The project was delivered within schedule and incident free.

Client: Barrick Gold

Project Value: >$1,000,000.00

Date Completed: 2023