Cross River Rail Project – RNA Girders

Project Case Study

Project Type

Location

Brisbane, QLD

About The Project

Sun Engineering was awarded the contract to complete the detailed drafting, procurement, fabrication (bridge girders and handrails), off-site assembly, protective coating, and installation for bridges 43 & 44 for the Cross River Rail Project. The bridges were delivered in stages to align with the operating rail corridor.

Client: Unity – Cross River Rail Project

Project Value: $3,500,000.00

Date Completed: 2023