Gold Coast City Council – Green Bridge

Project Case Study

Project Type

Location

Gold Coast, QLD

About The Project

Sun Engineering was awarded the contract to carry out the detailing, procurement, fabrication, protective coating, and delivery of a 242 tonne pedestrian bridge (bridge structure, walkways, handrails & guarding) for the Arts precinct on the Gold Coast. The Bridge was fabricated in 4 super sections (weighing between 60 – 70 tons each) and delivered via road and barge to the project site.

Client: Georgiou Brady JV

Project Value: $3,000,000.00

Date Completed: 2019