Gold Coast City Council – Green Bridge

Project Case Study

Location

Gold Coast, QLD

About The Project

Sun Engineering was awarded the contract to carry out the detailing, procurement, fabrication, protective coating, and delivery of a 242 tonne pedestrian bridge (bridge structure, walkways, handrails & guarding) for the Arts precinct on the Gold Coast. The Bridge was fabricated in 4 super sections (weighing between 60 – 70 tons each) and delivered via road and barge to the project site.

Client: Georgiou Brady JV

Project Value: $3,000,000.00

Date Completed: 2019