Sun Engineering was awarded the contract to do the detailing, fabrication and delivery of the new Purling Brook pedestrian swing bridge for Springbrook National Park in the Gold Coast Hinterlands. The bridge was lifted down via helicopter to the laydown area where it was then erected by crane into position and secured.
Client: Davbridge Constructions
Project Value: $90,000.00
Date Completed: 2014
"*" indicates required fields