Sun Engineering were awarded the contract to refurbish the 60-meter deep, 2-kilometre pipe shaft cover for the Gold Coast water treatment plant.
The project included extraction of the current steel members, painting, blasting, coatings and installation of these members back to their original condition.
Client: Veolia
Project Value: <$500,000.00
Date Completed: 2016
"*" indicates required fields