Gold Coast Water Pipe Shaft Cover

Gold Coast Water Pipe Shaft Cover Project Details
Scope
Sun Engineering were awarded the contract to refurbish the 60 meter deep, 2 kilometre pipe shaft cover for the Gold Coast water treatment plant.
The project included extraction of the current steel members, painting, blasting, coatings and installation of these members back to their original condition.
Value
$70,000.00
Date Completed
2016