Abbot Point
New Surge Bin SBo2
Scope
Sun Engineering were contracted to Abbot Point for the supply and installation of the 2000 ton coal load out surge bin. The bin sections were pre-fabricated offsite at our QLD workshop, in the largest transportable sizes and delivered to site for further assembly at ground level and completion in situ due to crane capacity restrictions.
Value
$23,700,000.00
Date Completed
2010
Replace Dump Station DS1
Scope
Construction of a new Coal Rail Dump Station including out loading conveyors, we were required to remove the existing mechanical and electrical equipment, conveyors and dump hoppers and manufacture new conveyors, dump hoppers and reinstall new mechanical equipment so as to upgrade the capacity of the coal terminal.
Value
$32,000,000.00
Date Completed
2010
X25 Upgrade
Scope
This includes the detailing, fabrication, installation and commissioning of the structural, mechanical, piping and electrical systems associated with the modifications to transfer towers, infeed conveyors, bund conveyor line 3, out loading conveyors and modification to existing transfer towers.
Value
$18,000,000.00
Date Completed
2009